CR74 – 2.9 Slip Repair Project
Bid Letting: 2/28/19 Bid Opening: 02/28/2019 Engineers' Est: $90,560.00 Bid Amount: $ 80389.76 Contractor: Allison Contracting LLC Contact:Mr. Eric HiltyJefferson CountyEngineer's Office740-283-8574This project consists of the construction of a 140 ft long...
CR17 Emergency Bridge Closure
CR17 will be closed to all through traffic effective 3/1/19 due to an emergency bridge closure. The closure is located 1.3 miles west of SR7.
CR36-Slip Repair Project
Bid Letting: 1/24/19 Bid Opening: 02/14/2019 Engineers' Est: $158,300 Bid Amount: $146,732.00 Closure: 4/29/19 No through Traffic Contractor: Howard L. Bowers Contracting Co. Contact:Mr. Eric HiltyJefferson CountyEngineer's Office740-283-8574This project...
CR47 & CR54-Slip Repair Project
Bid Opening: 01/24/2019 Engineers' Est: $383,439 Low Bid: $353,224.00 Contractor: Ohio West Virginia Excavating Co. Contact:Mr. Eric HiltyJefferson CountyEngineer's Office740-283-8574 This project consists of the construction of a 176 ft long drilled shaft...
CR72 & CR74-Slip Repair Project
Bid Opening: 12/6/2018 Engineers' Est: $121,043 Low Bid: $115,274.89 Contractor: Allison Contracting, LLC Contact:Mr. Eric HiltyJefferson CountyEngineer's Office740-283-8574 This project consists of the construction of a 64 ft long driven pile retaining...
CR4 – Slip Repair Project
Bid Opening: 01/01/2018Engineers' Est: $108,000Contact: Mr. Erik HiltyJefferson County Engineers Office740-283-8577 Details and Information
CR14 – Slip Repair Project
Bid Letting: 2/14/19 Bid Opening: 03/14/2019 Engineers' Est: $119,126 Bid Amount: $100,779.10 Contractor: Allison Contracting LLC Contact:Mr. Eric HiltyJefferson CountyEngineers Office740-283-8574 Project consists of installation of a 172 ft long driven...